Jump to content

Create a Free Account or Sign In to connect and share in green living and alternative energy forum discussions.

Vmworld 2015

Views: 913
This paper explores the system requirements to replace curent generation capacity,
. . . with a photovoltaic only generation scheme.  Topics include the:
. . . . . . definition of peak power demand,
. . . . . . time of use issues,
. . . . . . reserve power requirements,
. . . . . . storage to provide power when there is no sunlight, and
. . . . . . the various engineering challenges associated with,
. . . . . . managing a large area synchronous AC power grid.

09-05-2015 Source:  VMworld 2015


blog comments powered by Disqus