“Structuring solar projects, as power purchase agreements,
. . . enables municipal utilities, and their consumers,
. . . to adopt solar energy solutions, that may require no upfront capital, and
. . . provide long-term fixed power costs,
. . . that are less than projected market rates.”
A 13.8-megawatt (DC) solar generation project in Fort Mohave, Ariz.
. . . with a ground-mounted solar power system, is located across
. . . 84 acres, and fitted with a state-of-the-art
. . . single-axis tracking system, that enables the system to remain at
. . . an optimal angle to the sun throughout the day,
. . . maximizing energy output.
1-23-2017 Source: 13.8 Megawatt Solar Project
Create a Free Account or Sign In to connect and share in green living and alternative energy forum discussions. |
1
13.8 Megawatt Tracking Solar Project
Started by eds, Jan 23 2017 08:20 AM
No replies to this topic
0 user(s) are reading this topic
0 members, 0 guests, 0 anonymous users