Jump to content

Create a Free Account or Sign In to connect and share in green living and alternative energy forum discussions.

13.8 Megawatt Tracking Solar Project


 
No replies to this topic

#1 eds

eds

    Shifted

  • Global Moderator
  • 3,981 posts 263 rep

Posted 23 January 2017 - 08:20 AM

“Structuring solar projects, as power purchase agreements,
. . . enables municipal utilities, and their consumers,
. . . to adopt solar energy solutions, that may require no upfront capital, and
. . . provide long-term fixed power costs,
. . . that are less than projected market rates.”

A 13.8-megawatt (DC) solar generation project in Fort Mohave, Ariz.
. . . with a ground-mounted solar power system, is located across
. . . 84 acres, and fitted with a state-of-the-art
. . . single-axis tracking system, that enables the system to remain at
. . . an optimal angle to the sun throughout the day,
. . . maximizing energy output.

1-23-2017 Source:  13.8 Megawatt Solar Project

0 user(s) are reading this topic

0 members, 0 guests, 0 anonymous users